Foundations

1.6

Concrete Basement Floor Has Settled Or Heaved In A Finished Area

Acceptable Performance/Condition
Concrete floor slabs shall not settle more than 12 mm from their original position and shall not heave more than 50 mm.

Warranty
One-Year Work and Materials

Action
During first year the builder is to adjust stairwells, walls, furnace ducts, plumbing lines,
etc. to relieve any pressure caused by heaving.

Remarks
Homeowner is to maintain grading and water management.